Sunday 4th August saw the start of a very busy week for
renovation. The fundi came in, decided we needed a new floor (rather than
filling in the deep pot holes) and started smashing up the concrete. On Monday
5th he was clearing out the rubble and preparing the cracks in the
wall for filling. By Tuesday he had started laying the cement! This meant we
had to start on other aspects like getting quotes for the different materials
and carpenters, and starting on stamping the READ logo in the back covers of
the donated books.
|
4/8/13 Fundi removing the concrete top |
|
5/8/13 Fundi preparing floor for concrete |
|
5/8/13 Crack filling |
|
Concrete done! |
Wednesday called for a big clean of the outside front wall and after lunch
we started painting the outside wall white! :D The transformation begins! The
donated paint came in a 20lt bag which needed watering down, although the
suggested paint to water ratio made the mixture really quite thin. We had to
paint the outside wall with two coats, which was difficult as it was a bobbly
cement wall. We had the fundi paint some of the top as we couldn’t reach and
didn’t have a ladder, and we felt he was better off standing on the tables to
get to the top!
By Friday the inside had been cleaned and the first two coats had gone on. Almost time to add the splashes of READ blue!
I didn`t realise there was so much to do !!!
ReplyDelete